1. 模具低压下的开合模状况检查
1. Inspection of mold opening and closing under low pressure
模具分快、中、慢各3次开合,在开合过程中有无异常声响,有无阻滞现象;
The mold shall be opened and closed three times for fast, medium and slow respectively, and whether there is abnormal sound and blocking during the opening and closing process;
模具开合动作顺畅,有无干涉发生。
The opening and closing action of the die is smooth without interference.
2. 模具顶出系统的检查(低压下)
2. Inspection of mold ejection system (under low pressure)
顶出动作分快、中、慢各顶出3次,检查有无异常现象;
The ejection action is divided into fast, medium and slow ejection for 3 times respectively, and check whether there is any abnormality;
平面处的顶针(司筒)顶出后,是否会发生松脱或卡死;
Whether the thimble (cylinder) at the plane will be loosened or stuck after being ejected;
斜面顶针或司筒装置,是否加定位销(防止松动或转动);
Whether the inclined thimble or cylinder device is equipped with positioning pin (to prevent loosening or rotation);
顶出系统(顶针或顶块)顶出时是否有异常响声以及振颤。
Whether there is abnormal sound and vibration when the ejector system (ejector pin or ejector block) is ejected.
3. 模具复位的检查
3. Inspection of mold reset
模具分快、中、慢速度各复位3次,观看是否能回到位(复位);
The mold is reset 3 times at fast, medium and slow speeds respectively to see whether it can return to the position (reset);
复位后,斜顶针端面不高于模芯0.1mm或与模芯平齐;
After reset, the end face of the oblique thimble shall not be higher than 0.1mm or flush with the mold core;
复位用限位咭掣接触是否良好;
Whether the reset limit card is in good contact;
顶针顶出时是否与行位的动作发生干涉(滑块是否回到位);
Whether the ejector pin interferes with the action of the row position (whether the slider returns to the position);
模具是否装有顶针复位装置(机械式)。
Whether the die is equipped with thimble reset device (Mechanical).
4. 行位(滑块)动作的检查
4. Inspection of line position (slider) action
模具按快、中、慢各3次开合模,观察行位动作是否顺畅;
The mold shall be opened and closed three times for fast, medium and slow respectively, and observe whether the movement of the row position is smooth;
行位回位是否正常,与顶针是否发生干涉;
Whether the line return is normal and whether it interferes with the thimble;
行位定位是否牢靠;
Whether the row position positioning is firm;
液压抽芯装置动作顺序先后情况;
Action sequence of hydraulic core pulling device;
行位在空运行中有无拉伤、“卡死”现象。
Whether the line position is pulled or stuck during empty operation.