济南注塑加工厂家在注塑加工时要注意一些常见的问题,需要提前做好了解,然后做好预防措施,这样下一步才能顺利进行。下面我们来分析一下有关的问题。
Jinan injection molding manufacturers should pay attention to some common problems during injection molding. They need to understand them in advance, and then take preventive measures, so that the next step can be carried out smoothly. Let's analyze the relevant problems.
因为在接受模具的过程中总是存在一定的风险,所以对于任何可以想到的和可能出现的情况,都要提前进行风险评估。
Because there are always certain risks in the process of accepting the mold, risk assessment should be carried out in advance for any conceivable and possible situation.
着重要放在模具的复杂程度,零件的关键特性,零件的后加工质量以及模具移动过程中任何可预见的事故。
The importance lies in the complexity of the mold, the key characteristics of the parts, the post-processing quality of the parts and any foreseeable accidents during the movement of the mold.
如果评估后发现风险系数较高,在收货前应做更详细的搬家前准备。收货后要尽量避免模具损坏的发生,导致停产,对注塑企业的经营造成负面影响。
If the risk coefficient is found to be high after assessment, more detailed preparations should be made before receiving the goods. After receiving the goods, we should try our best to avoid the occurrence of mold damage, resulting in production stoppage and negative impact on the operation of injection molding enterprises.
厂家建议观察一组模具的运行情况,包括检查模具型腔状况、周期时间、成型工艺条件,其中四个不可思议点为评价值。如果模具不起作用,尤其是模具长期不用,在模具准备转移之前,需要进行试加工,以评估模具的使用价值。
The manufacturer suggests observing the operation of a group of molds, including checking the mold cavity condition, cycle time and molding process conditions, of which four inconceivable points are evaluation values. If the mold does not work, especially if the mold is not used for a long time, trial processing is required to evaluate the use value of the mold before the mold is ready to be transferred.
剩下的标本能知道的尽量多,但不可能知道更多细节。实际的生产过程条件可能是未知的,或者修改的过程参数可能是未知的。周期时间无法外推,特殊辅助设备可能不会引起注意。
The remaining specimens can know as much as possible, but it is impossible to know more details. The actual production process conditions may be unknown, or the modified process parameters may be unknown. The cycle time cannot be extrapolated, and special auxiliary equipment may not attract attention.
如果模具在加工一个零件时只使用模具中的部分型腔,而不是注射整个型腔时模具的运行状态,那么发给客户的各种数据的加工参数当然是有问题的。
If the mold only uses part of the cavity in the mold when processing a part, rather than the operating state of the mold when injecting the whole cavity, the processing parameters of various data sent to the customer are certainly problematic.
在卖方交付模具前,注塑机应在全注射状态下进行测试,以检查模具的每个产品的质量。就是这样。如果不重视存在的问题,会影响注射产品的质量,造成损失。更多相关事项就来我们网站
http://www.sdlqmj.com咨询吧!
Before the seller delivers the mold, the injection molding machine shall be tested in the full injection state to check the quality of each product of the mold. this is it. If we do not pay attention to the existing problems, the quality of injection products will be affected and losses will be caused. More related matters come to our website http://www.sdlqmj.com Consult!